January 28th, 2008

kitchen.jpg

Latest Planns

September 10th, 2007

houseplan4.jpg

houseplan1.jpg

houseplan3.jpg

houseplan2.jpg

houseplan5.jpg

houseplan6.jpg

houseplan7.jpg

houseplan8.jpg

Land Pictures

August 19th, 2007

img_0945.jpgimg_0938.jpg

img_0940.jpg

img_0942.jpg

img_0943.jpg

img_0946.jpg

img_0948.jpg

img_0953.jpg

August 16th, 2007

house_back_v20070715.jpghouse_front_v20070715.jpg

Some images on how the house will look from the outside (The house look better in real life then on these drawings)

August 16th, 2007

house_downstairs_v20070715.jpg

house_upstairs_v20070715.jpg

This is some old planns of the house. It is not the most recent ones but more to give you an idea of how it will look

New Land, New Constructor and new blog.

August 15th, 2007

  The new land is located in Thoiry that is closer to Saint Genis and the Swiss border then our previous land that was in Farge. We have several advantages on the new land that include  -          We have Central Gas (Before we were thinking of using this as heating, but have now decided to go with Air pump)-          We have more hours of sunlight in Thoiry then Farge, where farge was overshadowed by the Jura-          The structure of the lot is more green lands then before around our house The design of house is a more traditional house then our other house that had a more modern look. Where we are constructing there will be 5 other houses. The construction will start in November and they are now preparing water, Gas , Electric supply and constructing the access roads. They are at the moment on summer break but will continue the preparations of our land in the end of the month.  To access the land you go from Saint Genis to Holiday in. From holiday in you follow the road to thoiry. Turn left to thoiry and just before the road that goes up to Tricano(Jura parking) have a road that goes up. Follow thir road and turn the first to the right. You will come to a stop and you see our land to the right (land 4) We are now in the final plans on the house and hope the construction can start 1 or November.  The constructor think it can be done in 8 month. We hope to move in in early June if everything goes to schedule

img_0301.jpgimg_0309.jpg